MaxPPC controls the whole plant at the point of interconnection. It takes setpoints from the grid operator, measures the POI meter and sends each inverter its share, so active power, reactive power, power factor, voltage and ramp rates stay inside the grid code.

Grid operators set limits for the whole plant: maximum export, ramp rates, reactive power and voltage support. Setting each inverter by hand can't respond to changing sun, cable losses or an inverter that trips, and every breach risks penalties or a forced disconnection.
MaxPPC closes the loop on the revenue meter at the point of interconnection and corrects the inverters continuously, so the plant meets the limit while producing everything it is allowed to.
Each function can be switched on or off on its own, and every setpoint can come from the local operator, the grid operator or a calculation.
Export capped at the setpoint at the POI: curtailment, export limits and zero export, with the margin you choose.
Limits how fast plant power rises or falls (MW/min) on start-up, after a curtailment and when setpoints change.
Hold a reactive power setpoint (MVAr) or a power factor, leading or lagging, within the plant's capability.
Automatic voltage regulation with droop and deadband: reactive power support follows the measured POI voltage.
Plant setpoints shared out equally, pro-rata by capacity, by priority, or set by hand per inverter. Re-dispatched automatically when a device fails.
Write retries, setpoint refresh, device watchdogs and a fail-safe when the grid-operator link or the POI meter is lost.
Setpoints, enables and feedback exposed as a Modbus TCP slave map and a REST API, with Local/Remote authority and minimum write intervals.
Ready setpoint maps for Huawei, Sungrow, SMA, ABB, SolarEdge, Fronius, Delta and more, with per-device scaling and formats.
Plant start and stop commands with delays, ramped start targets, auto-restart and step-by-step sequencing across devices.
The grid operator sets the target, the POI meter measures the result, and MaxPPC corrects the inverters until both agree.
Setpoints arrive from the grid operator (Remote) or the plant operator (Local), checked against limits.
P, Q, voltage and PF are read from the POI meter every second.
The controller corrects the error within the ramp limits and the plant's capability.
Each inverter gets its own setpoint over Modbus, with retries, refresh and watchdogs.

MaxPPC runs as its own service, so control never depends on the SCADA, the historian or the web UI. Together with MaxSCADA you also get the full picture:
Plant control and monitoring for the solar portfolio supplying the Aqaba Special Economic Zone Authority and GID.
MaxPPC together with MaxSCADA.
Plant control and monitoring for the university's solar project.
Tell us your plant size, inverter brands and the grid operator's requirements, and our engineers will propose the right control setup.