MaxEnergicMaxSCADAMaxPPCZeroexportWeather StationWindows apps
Power Plant Controller · Grid code · Dispatch

Your plant, exactly as the grid asks.
Every second.

MaxPPC controls the whole plant at the point of interconnection. It takes setpoints from the grid operator, measures the POI meter and sends each inverter its share, so active power, reactive power, power factor, voltage and ramp rates stay inside the grid code.

  • Closed loop on the POI meter, not open-loop guesses
  • Runs on its own, separate from the SCADA, for reliability
  • In service on utility-scale plants in Jordan
MaxSCADA · plant power vs expected (PPC limit 10:00–14:00)
Plant active power held flat at the PPC limit while the expected power from the sun is higher
P · Q · PF · Vcontrol modes
Ramplimits up and down
Modbus · APIsetpoints from the grid operator
Local / Remoteclear control authority
Why a PPC

The grid code is measured at the POI, not at the inverter

Grid operators set limits for the whole plant: maximum export, ramp rates, reactive power and voltage support. Setting each inverter by hand can't respond to changing sun, cable losses or an inverter that trips, and every breach risks penalties or a forced disconnection.

MaxPPC closes the loop on the revenue meter at the point of interconnection and corrects the inverters continuously, so the plant meets the limit while producing everything it is allowed to.

Without a PPC

  • Fixed inverter limits with a big safety margin
  • Slow manual response to grid-operator requests
  • Breaches when an inverter trips or the sun changes

With MaxPPC

  • Plant held at the setpoint measured at the POI
  • Grid-operator setpoints applied automatically
  • Load re-shared at once when an inverter drops out
Control modes

Everything the grid code asks for

Each function can be switched on or off on its own, and every setpoint can come from the local operator, the grid operator or a calculation.

Active power limit

Export capped at the setpoint at the POI: curtailment, export limits and zero export, with the margin you choose.

Ramp-rate control

Limits how fast plant power rises or falls (MW/min) on start-up, after a curtailment and when setpoints change.

Reactive power & PF

Hold a reactive power setpoint (MVAr) or a power factor, leading or lagging, within the plant's capability.

Voltage control

Automatic voltage regulation with droop and deadband: reactive power support follows the measured POI voltage.

Smart dispatch

Plant setpoints shared out equally, pro-rata by capacity, by priority, or set by hand per inverter. Re-dispatched automatically when a device fails.

Watchdogs & fail-safe

Write retries, setpoint refresh, device watchdogs and a fail-safe when the grid-operator link or the POI meter is lost.

Grid-operator interface

Setpoints, enables and feedback exposed as a Modbus TCP slave map and a REST API, with Local/Remote authority and minimum write intervals.

Inverter control profiles

Ready setpoint maps for Huawei, Sungrow, SMA, ABB, SolarEdge, Fronius, Delta and more, with per-device scaling and formats.

Start / stop sequencing

Plant start and stop commands with delays, ramped start targets, auto-restart and step-by-step sequencing across devices.

How it works

One closed loop around the whole plant

The grid operator sets the target, the POI meter measures the result, and MaxPPC corrects the inverters until both agree.

Grid operator / NCCP, Q, PF, V setpoints MaxPPCclosed loop · ramp · dispatch Inverterseach gets its share POI revenue metermeasured P, Q, V, PF MaxSCADAtrends, events, reports Modbus / API setpoints power feedback status & events
1

Receive

Setpoints arrive from the grid operator (Remote) or the plant operator (Local), checked against limits.

2

Measure

P, Q, voltage and PF are read from the POI meter every second.

3

Correct

The controller corrects the error within the ramp limits and the plant's capability.

4

Dispatch

Each inverter gets its own setpoint over Modbus, with retries, refresh and watchdogs.

MaxSCADA · Dashboard
MaxSCADA dashboard showing plant power, PR, availability and device status
Better together

MaxPPC + MaxSCADA

MaxPPC runs as its own service, so control never depends on the SCADA, the historian or the web UI. Together with MaxSCADA you also get the full picture:

  • Every setpoint logged: what the grid operator asked for, what the PPC sent and what the POI delivered.
  • Curtailment losses: energy held back by the PPC, separated from faults and soiling in the reports.
  • Grid events: frequency and voltage excursions, recorded for the grid operator.
  • One team, one supplier: SCADA, PPC and commissioning from the same engineers.
Discover MaxSCADA →
Client references

Controlling plants across Jordan

Yellow Door Energy · SCADA & PPC

ASEZA and GID

Aqaba, Jordan · 24.3 MWp · 20 MW AC

Plant control and monitoring for the solar portfolio supplying the Aqaba Special Economic Zone Authority and GID.

SCADA & PPC

Al Hazza

Jordan · 13.6 MW AC

MaxPPC together with MaxSCADA.

Applied Science Private University · SCADA & PPC

ASU solar project

Jordan · 6.4 MWp total

Plant control and monitoring for the university's solar project.

Contact us

Ask about pricing, a demo, or your grid code

Tell us your plant size, inverter brands and the grid operator's requirements, and our engineers will propose the right control setup.

Send an inquiry

We reply within one business day. Your details are used only to answer your inquiry.